Pengaruh Ukuran Daerah, Opini Audit dan Tingkat Ketergantungan Keuangan Daerah Terhadap Audit Delay

  • Fitri Rianti Sekolah Tinggi Ilmu Ekonomi Pandu Madania
  • Dewi Sarifah Tullah Sekolah Tinggi Ilmu Ekonomi Pandu Madania
  • Erma Apriyanti Sekolah Tinggi Ilmu Ekonomi Pandu Madania
Keywords: Audit delay, Audit opinion, Level of regional dependency, Area size

Abstract

This study aims to examine and discuss the effect of regional size, audit opinion and the level of regional financial dependence on audit delays in the 2015 and 2016. The population of this study is all Regency / City Governments in Indonesia in 2015 and 2016. This study uses a purposive sampling technique or by criteria determined by the researcher. The criteria for selecting the sample in this study are the Regency / City Governments in Indonesia in 2015 and 2016 who in their financial statements express the auditor's opinion given by BPK to the Regency / City Government and Regency / City Government whose LKPD discloses the number of accounting entities owned by the regional government. Data analysis methods that will be used in this study include Methodof Successive interval / MSI, Classic Assumption Test, Multiple Linear regression analysis and Hypothesis Test. The results of this study indicate that the size of the area does not affect the audit delay while the audit opinion and the level of regional dependence affect the audit delay

Downloads

Download data is not yet available.

References

Annisa, D. (2018). Pengaruh Ukuran Perusahaan, Jenis Opini Auditor, Ukuran KAP dan Audit Tenure Terhadap Audit Delay. JABI (Jurnal Akuntansi Berkelanjutan Indonesia), 1(1), 108-121.

Aryaningsih, N. N. D., & Budiartha, I. K. (2014). Pengaruh Total Aset, Tingkat Solvabilitas, dan Opini Audit pada Audit Delay. E-Jurnal Akuntansi, 747-760.

Belkaoui, Ahmed Riahi. (2008). “Accounting Theory” Firth Editions, Singapura: Cangage Learning Asia Fasific Ltd

Cohen, S., & Leventis, S. (2013, March). Effects of municipal, auditing and political factors on audit delay. In Accounting Forum (Vol. 37, No. 1, pp. 40-53). Taylor & Francis.

Dyer, J.d and A.J. McGough. “The Timeliness of The Australian Annual Report”. Journal ofAccounting Research. Autumn, 1975 pp204-219, 1975.

Dwyer, P. D., & Wilson, E. R. (1989). An empirical investigation of factors affecting the timeliness of reporting by municipalities. Journal of Accounting and Public Policy, 8(1), 29-55.

Eisenhardt, K. M. (1989). Agency theory: An assessment and review. Academy of management review, 14(1), 57-74.

Fachrurozi, L. (2014). Analisis Faktor-Faktor yang Mempengaruhi Audit Delay pada Pemerintah Daerah di Indonesia. Skripsi. Semarang: Fakultas Ekonomika dan Bisnis Universitas Diponegoro.

Hardini, Z. G., & Sukirman, S. (2016). Analisis Determinan Audit Delay Pada Pemerintah Kabupaten/Kota Di Indonesia. Accounting Analysis Journal, 5(1), 1–8. https://doi.org/10.15294/aaj.v5i1.9749

International Public Sector Accounting Standars Boards. (2010). “Conseptual Framework For General Purpose Financial Reporting By Public Sector Entities”. The International Federation Of Accountants (IFAC)

Kartiko, Sigit Wahyu et al. (2015). “Pengaruh opini audit, kualitas auditor, dan sistem informasi akuntansi terhadap keterlambatan penerbitan laporan hasil pemeriksaan laporan keuangan pemerintah daerah”. Artikel di presentasikan di Simposium Nasional Akuntansi 18, di Universitas Sumatera Utara Medan.

Lestari, K. A. N. M., & Saitri, P. W. (2017). Analisis Pengaruh Ukuran Perusahaan, Profitabilitas, Solvabilitas, Kualitas Auditor Dan Audit Tenure Terhadap Audit Delay Pada Perusahaan Manufaktur Di Bursa Efek Indonesia Periode 2012-2015. Jurnal Ilmiah Manajemen & Akuntansi, 23(1), 1–11.

McLelland, A. J., & Giroux, G. (2000). An empirical analysis of auditor report timing by large municipalities. Journal of Accounting and Public Policy, 19(3), 263-281.

Payne, J. L., & Jensen, K. L. (2002). An examination of municipal audit delay. Journal of Accounting and Public Policy, 21(1), 1-29.

Mardiasmo., (2009,)Akuntansi Sektor Publik, Yogyakarta: ANDI

Muladi, Aris. (2014). “Faktor-Faktor yang Mempengaruhi Audit Delay pada Pemerintah Kota/Kabupaten di Indonesia”.Semarang: Fakultas Ekonomika dan Bisnis Universitas Diponegoro.

Mulyadi. (2002). “Auditing” Buku 1, Jakarta: Salemba Empat.

Munief, Itsniawan Abdul dan Suranta Sri. (2016). “Audit Report Lag Pada Pemerintah Kabupaten/Kota Di Indonesia”SNEMA-2015. Padang: Fakultas EkonomiUniversitas Negeri Padang.

Peraturan Pemerintah No 17 Tahun 2010 Tentang Standar Akuntansi Pemerintah

Praptika, P. Y. H., & Rasmini, N. K. (2016). Pengaruh audit tenure, pergantian auditor dan financial distress pada audit delay pada perusahaan consumer goods. E-Jurnal Akuntansi, 2052-2081.

Rachmawi, S., Rini, R., & Fitri, Y. (2016). Faktor – Faktor Yang Mempengaruhi Ketepatan Waktu Pelaporan Keuangan Pemerintah Daerah Di Indonesia. Akuntabilitas, 9(1), 143–160. https://doi.org/10.15408/akt.v9i1.3589

Rahmawati, Zidni. (2016). “Audit Delay Danfaktor-Faktor YangMempengaruhinya(Studi Empiris Pada Perusahaan ManufakturYang Terdaftar Di Bursa Efek Indonesia Tahun 2011-2014)” Naskah Publikasi. Surakarta: Fakultas Ekonomi Dan BisnisUniversitas Muhammadiyah Surakarta.

Ruroh, F. M., & Rahmawati, D. (2016). Pengaruh Pergantian Manajemen, Kesulitan Keuangan, Ukuran Kap, dan Audit Delay terhadap Auditor Switching Studi Kasus pada Perusahaan Manufaktur yang Terdaftar di Bursa Efek Indonesia Tahun. Nominal, Barometer Riset Akuntansi dan Manajemen, 5(2), 68-80.

Siregar, B. (2015). Pengaruh Karakteristik Pemerintahan Terhadap Audit Delay Laporan Keuangan. Jrak, 11(2), 89–106.

Subekti, Imam dan N.W. Widiyanti. (2004). “Faktor-Faktor yang Berpengaruh terhadap Audit Delay di Indonesia”. Dalam Simposium Nasional Akuntansi VII

Sugiyono, P. (2010). Metode Penelitian Kuantitatif, Kualitatif, Dan R&D. Bandung: CV Alfabeta.

Tiono, Ivena dan Yulius Jogi C. (2013). “Faktor-Faktor yang Mempengaruhi AuditReport Lag di Bursa Efek Indonesia”. Dalam Business Accounting Review. Vol 1 No 3. Surabaya: Universitas Kristen Petra

Published
2019-09-30
How to Cite
Rianti, F., Tullah, D., & Apriyanti, E. (2019). Pengaruh Ukuran Daerah, Opini Audit dan Tingkat Ketergantungan Keuangan Daerah Terhadap Audit Delay. ATESTASI : Jurnal Ilmiah Akuntansi, 2(2), 87-97. https://doi.org/10.33096/atestasi.v2i2.271
Section
Artikel